SR CLC/TR 50451:2007

Railway applications - Systematic allocation of safety integrity requirements

The scope of this Technical Report is to define a method to determine the required Safety Integrity Level of railway signalling equipment taking in consideration • the operational conditions of the railway, and • the architecture of the signalling system. From a mechanistic point of view the task of this Technical Report is to define a method of calculation, which determines the integrity requirements (qualitatively and quantitatively) from the inputs stated above.

Status : Withdrawn
Approval date : 12/15/2007
Publish date : 12/17/2007
Withdrawal date : 11/23/2021
Number of pages : 86
ICS : 45.020 Railway engineering in general,93.100 Construction of railways
Technical Committee : 4 - Electrical equipment and systems for railways

Relations with other standards: