SR EN 50518-1:2011
Monitoring and alarm receiving centre -- Part 1: Location and construction requirements
This Part 1 of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site.
Status :
Withdrawn
Approval date : 2/28/2011
Withdrawal date : 10/7/2016
Number of pages : 26
ICS : 13.320 Alarm and warning systems
Technical Committee : 27 - Alarm systems
- Normative reference SR EN 14846:2009
- Normative reference SR EN 1627:2011
- Normative reference SR EN 1906:2010
- Normative reference SR EN 50131-4:2010
- Normative reference SR EN 50136-1-1:2004/A1:2004
- Normative reference SR EN 50131-1:2007
- Normative reference SR EN 356:2003
- Normative reference SR EN 1303:2005
- Normative reference SR EN 13779:2007
- Normative reference SR EN 50272-2:2003
- Normative reference SR EN 50132-7:2002
- Normative reference SR EN 12209:2004
- Normative reference SR EN 62040-1:2009
- Normative reference SR EN 13501-2+A1:2010
- Normative reference SR EN 50136-1-1:2004
- Normative reference SR EN 1522:2004
- Normative reference SR EN 179:2008
- Normative reference SR EN 1063:2003
- Normative reference SR EN 50136-1-1:2004/A2:2009
- Replaced by SR EN 50518-1:2014
RO