SR EN 60255-22-5:2011
Measuring relays and protection equipment -- Part 22-5: Electrical disturbance tests - Surge immunity test
IEC 60255-22-5:2008 specifies the general requirements for surge immunity tests for measuring relays and protection equipment for power system protection, including the control, monitoring and process interface equipment used with those systems. Is based on IEC 61000-4-5. The objective of the tests is to confirm that the equipment under test will operate correctly when energized and subjected to high-energy disturbances on the power and interconnection lines, caused by surge voltages from switching and lightning effects. The main change in this new edition concerns line to earth tests.
Status :
Withdrawn
Approval date : 9/30/2011
Withdrawal date : 6/28/2016
Number of pages : 46
ICS : 29.120.70 Relays
Technical Committee : 23 - Industrial -process measurement and control
- Replaces SR EN 60255-22-5:2003
- Replaced by SR EN 60255-26:2014