SR EN 50342-1:2016/A2:2021
Lead-acid starter batteries - Part 1: General requirements and methods of test
TC21X working group 3 has been agree to implement following changes to EN 50342-1:2015/1:2018 - Deletion of high current discharge after water consumption test. This is not needed as a dedicated corrosion test is available in the document. - Limitation of the maximum discharge time in cranking performance test. Batteries with high power capability might be damaged if discharge until the cut off voltage of 6,0 V is reached. To prevent this the maximum discharge time of the second step of the cranking performance test has been limited to 180 s.
Status :
Valid
Approval date : 11/29/2021
Number of pages : 5
ICS : 29.220.20 Acid secondary cells and batteries
Technical Committee : 161 - Secondary cells and batteries
- Amends SR EN 50342-1:2016
RO