SR EN 50549-2:2019/A1:2023
Requirements for generating plants to be connected in parallel with distribution networks - Part 2: Connection to a MV distribution network - Generating plants up to and including Type B
This document specifies the technical requirements for the protection functions and the operational capabilities for generating plants, intended to operate in parallel with LV distribution networks. For practical reasons this document refers to the responsible party where requirements have to be defined by an actor other than the DSO e.g. TSO, member state, regulatory authorities according to the legal framework. Typically the DSO will inform the producer about these requirements.
Status :
Valid
Approval date : 11/29/2023
Number of pages : 12
ICS : 29.160.20 Genarators
Technical Committee : 167 - The aspects related to the parameters of electric power systems, the requirements for grid connection of generating plants, and smart grid user interface
- Amends SR EN 50549-2:2019
RO